ADU design and permits in Sacramento

We draw the plans or adapt a pre-approved design, then manage plan check until the permit is issued.

Pencil sketches of a building plan beside a coffee cup

What goes into a permit set?

  • A survey-based site plan
  • Architectural drawings
  • Structural and energy design
  • Any planning forms the city requires before building review
Hands drafting construction drawings next to a laptop
Hands drafting construction drawings next to a laptop

Custom or pre-approved plans?

A pre-approved design is faster to permit when it fits the lot. When it does not, a custom plan avoids forcing the yard to fit the drawing.

How long does review take?

State law caps review at 60 days once an application is complete. The real schedule depends on how quickly corrections are turned around.

Sacramento permit steps

Building permits for ADUs go through the city's online Citizen Portal. The submittal includes the permit application, a hold harmless agreement, an address request and the plans.

Related

Is your lot ready for an ADU?

Send your address and a sentence about what you want. We look up the zoning, setbacks and utility routes and reply with the ADU types that fit.